Home / Guides
Guides
How earthwork takeoffs and GPS machine control models get built, written from real jobs.
All guides
- How to do an earthwork takeoff: ten steps, from gathering the plan set to checking the cut and fill
- Earthwork volume calculation methods: grid, average end area, prismoidal and surface to surface, with formulas
- Files needed for a GPS machine control model: what to gather and what to ask the engineer for
ToolsReferenceEarthwork takeoff servicesGPS machine control models
Send the plans, get a price
Quotes are free and come before any work starts. Delivery is 3 to 5 business days, nationwide.