Earthwork and machine control glossary
Plain definitions of the terms on this site.
Volume terms
- Bank cubic yard (BCY)
- A cubic yard of soil measured in the ground, before it is dug.
- Loose cubic yard (LCY)
- A cubic yard of soil after digging, when it has swelled. Trucks haul loose yards.
- Compacted cubic yard (CCY)
- A cubic yard of soil after it is placed and compacted.
- Swell
- The gain in volume when soil is dug. Common earth swells about 25%. See swell and shrink factors.
- Shrink
- The loss in volume when soil is compacted, compared with its bank volume.
- Cut
- Soil that has to come out because the design is below existing ground.
- Fill
- Soil that has to go in because the design is above existing ground.
- Balance
- A site balances when the cut, after shrink, covers the fill.
- Import
- Soil brought to the site because the cut does not cover the fill.
- Export
- Soil hauled off because the cut is more than the fill needs.
Grading terms
- Existing grade (EG)
- The ground surface before work starts.
- Finished grade (FG)
- The final surface shown on the grading plan.
- Subgrade
- The surface the dirt crew builds to, below pavement, slabs and base.
- Topsoil stripping
- Removing the top layer of organic soil before grading. The depth comes from the geotech report.
- Over-excavation
- Digging below subgrade to remove and recompact unsuitable soil.
- Daylight line
- Where a cut or fill slope meets existing ground.
- Earthwork takeoff
- A measurement of cut, fill, stripping and import or export for a job. See earthwork takeoffs.
- Cut/fill map
- A plan of the site colored by depth of cut and fill. See cut/fill maps.
Machine control terms
- Machine control model
- The 3D surface and linework a GPS dozer, grader or excavator follows. See GPS machine control models.
- Data prep
- Another name for building machine control models.
- TIN surface
- A surface made of triangles between points, used by takeoff and machine control software.
- Breakline
- A 3D line, such as a curb or the top of a slope, that the surface has to follow.
- Control point
- A surveyed point with known coordinates and elevation, used to set up GPS on site.
- Site calibration
- The fit between GPS positions and the project's coordinates, built from control points. Also called localization.
- LandXML
- An open file format for surfaces, alignments and points.