Earthwork.io

Home / Earthwork takeoff services

Earthwork takeoff services

An earthwork takeoff measures how much dirt a job moves: cut, fill, topsoil stripping, and what has to be imported or hauled off. We build it from your grading plans and send back quantities you can bid with. Takeoffs start at $450 and are delivered in 3 to 5 business days. The starting price includes the cut/fill map and all earthwork reports.

What a takeoff covers

  • Cut and fill volumes, existing ground against design subgrade
  • Topsoil stripping volume
  • Import or export balance
  • Areas and volumes by region or phase when the job calls for it
  • A cut/fill map that shows where the dirt moves
  • All earthwork reports

What we need from you

  • Grading plan sheets as PDFs, and CAD files if you have them
  • The geotech report, for stripping depth, shrink and swell, and any over-excavation
  • Paving and building sections, so subgrade is held down the right amount under pavement and slabs
  • Your bid date

Sample cut/fill maps

Cut/fill map of a subdivision drawn over an aerial photo
A subdivision, drawn over the aerial.
Cut/fill map of streets and lots
Streets and lots.
Cut/fill map of streets and lots viewed in 3D
The same kind of map viewed in 3D.

From Affordable Site Model jobs.

How we build it

We build existing ground and design subgrade as two surfaces in AGTEK and measure the difference between them.

Before we start, we check the plan set for what a takeoff needs: existing grades, design grades and the geotech report. If something is missing, we tell you before we start.

What moves the price

  • Site size and the number of grading sheets
  • PDF only, or CAD files available
  • Phasing, separate regions or separate bid items
  • Rock, over-excavation or other geotech requirements
  • Plan revisions after the takeoff starts

Questions

How accurate is an earthwork takeoff?

It is as accurate as the plans it comes from. Existing grades from an old or coarse survey limit any takeoff. When the plans leave gaps, we tell you.

How fast is turnaround?

3 to 5 business days.

Can you work from PDFs only?

Yes. Takeoffs are built from the plan PDFs. CAD files help when the engineer will release them.

Do you price the work?

No. A takeoff gives you quantities and an estimate puts prices on them. We deliver the quantities and the map. Your crew costs and production rates stay yours.

What does an earthwork takeoff cost?

Takeoffs start at $450, which includes the cut/fill map and all earthwork reports. Every job is quoted from the plans before work starts. See pricing.

Are you engineers?

No. Earthwork.io is operated by Affordable Site Model Inc., which is not a civil engineering firm. We build takeoffs and models from the engineer's plans. We do not design or stamp anything.

Send the plans, get a price

Quotes are free and come before any work starts. Delivery is 3 to 5 business days, nationwide.

559-593-9060

Not ready for a quote?

Leave your details and we will give you a call.

By sending your details you agree to be contacted about your request. See our privacy policy.